Distrigo Parts Hub
project details
Rose Interiors
Client
£154k
Value
20 Weeks
Duration
Project specifics include:
- Full refurbishment of parts storage facility and office block.
- Electrical installation to multitier racking system and mezzanine level providing flexible robust lighting installation to allow any future alterations controlled by individual movement sensors.
- New fire alarm system with interface to BMS.
- New office installation inclusive of high efficiency LED lighting/light occupancy and movement detection zoned to suit the office layout linked to daylight dimming.
- Mains Distribution, Containment & Lighting
- PIR/Occupancy/daylight dimming lighting control
- Small Power/skirting trunk/floor box installation
- Data and TV Distribution System
- Fire Alarm Installation