Truck Hydraulics
project details
Truck Hydraulics
Client
£60k
Value
12 Weeks
Duration
- Full refurbishment workshop facility and office block.
- New fire alarm system with interface to BMS.
- New office installation inclusive of high efficiency LED lighting/light occupancy and movement detection zoned to suit the office layout linked to daylight dimming.
- New office small power by a combination of skirting trunk and floor box installation.
- New mains distribution system to cater for increased loads
- Mains Distribution
- Containment
- Lighting
- PIR/Occupancy/daylight dimming lighting control
- Small Power/skirting trunk/floor box installation
- Data and TV Distribution System
- Fire Alarm Installation